IMAGES
The raised floor of the paint booth is a possible solution, although it is not very practical, as access is from a ramp positioned at the front.
The floor includes a metal support structure with iron legs and a metal containment perimeter.
The ramp is composed of a load-bearing structure and an upper grille.
5 ROWS OF GRIDS ONLY POSSIBLE | ||
---|---|---|
Ground clearance | m. 0.45 | ft. 1.48 |
Access ramp | m. 3.0 X 2.7 | ft. 9.9 X 8.9 |